Chovar substation

installation, testing and commissioning of 132/11 kV GIS Chovar substation project with an installed capacity of two 45 MVA transformers (total 90 MVA), and this project is connected to the national grid to improve electricity supply reliability in the Kathmandu Valley.

Locationchovar
TechnologyGIS
Voltage / capacity132/11 kV · 2×45 MVA (90 MVA total)

Project overview

installation, testing and commissioning of 132/11 kV GIS Chovar substation project with an installed capacity of two 45 MVA transformers (total 90 MVA), and this project is connected to the national grid to improve electricity supply reliability in the Kathmandu Valley.

Featured image

Chovar substation featured image

Gallery